International Rivers Comments on CDM Methodology Proposed for Simimbe Large Hydro (Ecuador)
Submitted to CDM Methodology Panel
Title of new baseline methodology: Country risk analysis, baseline scenario development, and ex-ante baseline emission rate calculation for a grid-connected project that displaces fossil fuel based power generation from the operation and expansion of the electric sector (NM0054)
Barbara Haya
Consultant
International Rivers
April 5, 2006